{"id":494,"date":"2015-01-24T23:30:34","date_gmt":"2015-01-25T06:30:34","guid":{"rendered":"http:\/\/tucsonhistoricdepot.org\/?page_id=494"},"modified":"2015-05-13T18:34:14","modified_gmt":"2015-05-14T01:34:14","slug":"timeline-2002september","status":"publish","type":"page","link":"https:\/\/tucsonhistoricdepot.org\/?page_id=494","title":{"rendered":"Timeline 2002,September"},"content":{"rendered":"<p style=\"text-align: center;\">\u00a0<a href=\"http:\/\/tucsonhistoricdepot.org\/?page_id=501\"><i>NEXT TIMELINE EVENT<\/i><\/a><\/p>\n<table border=\"0\" width=\"592\" cellpadding=\"2\">\n<tbody>\n<tr>\n<td align=\"right\" valign=\"top\" width=\"300\"><span style=\"color: #cc0000; font-family: garamond,times; font-size: xx-large;\"><b>September 10, 2002<\/b><\/span><span style=\"color: #000000; font-family: garamond,times; font-size: xx-large;\">Steel enclosure is completed<\/span><br \/>\n<span style=\"color: #666666; font-family: garamond,times; font-size: large;\"><b>A protective steel enclosure is erected around the proud old engine, provided directly by private contributions and goverment funding. \u00a0Completely protected from the blazing sun and rust inducing rain, the locomotive sits on display for all to enjoy. \u00a0A celebration is held at the depot site. \u00a0The task force, its mission accomplished, is dissolved.<\/b><\/span><\/td>\n<td align=\"center\" valign=\"top\" width=\"292\">\n<table border=\"0\" width=\"250\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td valign=\"top\"><a href=\"http:\/\/tucsonhistoricdepot.org\/wp-content\/uploads\/2015\/01\/onsite.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-498\" src=\"http:\/\/tucsonhistoricdepot.org\/wp-content\/uploads\/2015\/01\/onsite.jpg\" alt=\"onsite\" width=\"533\" height=\"350\" \/><\/a><br \/>\n<span style=\"color: #000000; font-family: arial;\"><b>Southern Pacific Locomotive #1673 in its new home. <\/b><\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" align=\"right\" valign=\"top\"><center><span style=\"font-family: verdana,arial,helvetica; font-size: xx-small;\"><a href=\"http:\/\/tucsonhistoricdepot.org\/\">MAIN PAGE<\/a> | <a href=\"http:\/\/tucsonhistoricdepot.org\/?page_id=486\">PREVIOUS TIMELINE EVENT | <\/a><a href=\"http:\/\/tucsonhistoricdepot.org\/?page_id=501\">NEXT TIMELINE EVENT<\/a><\/span><\/center><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0NEXT TIMELINE EVENT September 10, 2002Steel enclosure is completed A protective steel enclosure is erected around the proud old engine, provided directly by private contributions and goverment funding. \u00a0Completely protected from the blazing sun and rust inducing rain, the locomotive sits on display for all to enjoy. \u00a0A celebration is held at the depot site. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"https:\/\/tucsonhistoricdepot.org\/index.php?rest_route=\/wp\/v2\/pages\/494"}],"collection":[{"href":"https:\/\/tucsonhistoricdepot.org\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tucsonhistoricdepot.org\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tucsonhistoricdepot.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tucsonhistoricdepot.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=494"}],"version-history":[{"count":7,"href":"https:\/\/tucsonhistoricdepot.org\/index.php?rest_route=\/wp\/v2\/pages\/494\/revisions"}],"predecessor-version":[{"id":883,"href":"https:\/\/tucsonhistoricdepot.org\/index.php?rest_route=\/wp\/v2\/pages\/494\/revisions\/883"}],"wp:attachment":[{"href":"https:\/\/tucsonhistoricdepot.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}